Customization: | Available |
---|---|
Product Type: | Fiber Cement Board Production Line |
Automatic Grade: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Amulite-Fiber Cement Corrugated Roof Sheets Production Line
Production Specification: Length X Width X Height :(900~1220)x(2440~3100)x(4~15)MM(Customizable)
1.1 Production Capacity
1.2 Storage Volume Of Main Raw Materials
1.2.1 Storage Requirements
Key Performance Indicators
Item | Unit | Fiber Cement Corrugated Sheet |
Density | g/cm³ | 0.9-1.40 |
Bending Degree | MPA | >9 |
Thermal Conductivity | W/m·K | <0.29 |
Impact Strength | kJ/mm² | >2.0 |
Screw Pull-Out Strength | N/mm | <0.2 |
Shrinkage | % | |
Incombustible | GB8624A | Incombustible Material |
1.Q:Are You A Manufacturer Or A Trading Company?
A:We Are A Manufacturer With 36years Of Experience And An International Trade Team. We Own A 50,000 Square Meter Manufacturing Factory And We Have About 150 Workers.
2.Q:Which Loading Port?
A:Ports: Tianjin, Qingdao, Shanghai, Lianyuan Port, Shenzhen, Guangzhou, Etc.
3.Q:Can You Provide Customized Equipment?
A: Customized Equipment Can Be Provided According To Customer Requirements,we Can Print Your LOGO Or Information On The Machinery Or Packaging.
4.Q:What Payment Method Do You Usually Use?
A:Payment Terms:30% Advance Payment,65% Payment Before Loading,5%Payment Within 30Days After Installation;
5.Q:What Is The Delivery Time Of Your Equipment?
A:About 120-150Days.
6.Q:How Do You Guarantee Product Quality?
A:We Have Strict Quality Control Checks In Each Process. There Are Test Reports Of Our Products. All Our Products Comply With Industry Standards.
7.Q:Do You Provide Engineer Installation And Commissioning Services? How Long Does It Take To Install And Commissioning?
A:Yes, We Have A Team Of 50 Engineers Around The World Responsible For Installation And Commissioning Services. Installation And Commissioning Takes About 90-120 Days.